H Street Reconstruction Update

Y&K, Inc. has installed the 8-inch water main from 3rd to 5th Street on H Street. Y&K will start connecting temporary water lines into the new permanent water main this week, June 24-June 30, 2014. During the time that the water lines are hooked to the new main there will be temporary water shut offs. ... more »

Fly-In this Saturday, June 28

Fly In 2013 (42) Salida Air Show - Medium The Second Annual Salida Fly-In returns this Saturday, June 28 from 8:00 a.m. to 4:00 p.m. to Harriet Alexander Field, at 9255 CR 140. Don't miss this exciting free event for the entire family. This year will feature ... more »

Salida Receives GOCO Grant for Salida River Trail

GOCO logo     Salida Logo_NEW The City of Salida received a $489,614 Great Outdoors Colorado (GOCO) Path to Parks Grant to help fund the Salida River Trail Project. The grant, applied for in March by former Community Development Director Michael Yerman ... more »

Pool Closure This Weekend for Alicia Leavitt Memorial Swim Meet

Salida Hot Springs Pool Closed For Alicia Leavitt Memorial Swim Meet Salida Hot Springs Aquatic Center will be closed from 10am, Friday, June 27 through Sunday, June 29, 2014 for the annual Alicia Leavitt Memorial Swim Meet.  We will reopen Monday June 30th at 6am for lap swim. This is the only home swim meet for ... more »

Salida Hot Springs Aquatic Center Reopening 06-21-2014

The maintenance issue at the Salida Hot Springs Aquatic Center has been identified and fixed by the dedicated pool maintenance staff! The pool will re-open tomorrow and resume their normal schedule. Thank you for your patience during this issue, and we hope to see you at the pool soon! more »

Request for Bids to Perform Sewer Video Inspection

Sealed bids for sewer line cleaning (jetting), video inspection and report generation will be received at the City of Salida Public Works building at 340 West Highway 291, Salida, CO 81201 until 11:00 AM July 8,2014 at which time they will be publicly opened and read. The project consists of the internal closed circuit television (CCTV) inspection of sanitary ... more »

Salida Hot Springs Aquatic Center Closure

The Salida Hot Springs Aquatic Center will be closed at 4:00 p.m. today for a maintenance issue. The maintenance staff is diligently working to remedy the problem and updates will be provided as they become available. Thank you for your understanding, we hope to see you soon! more »

Sidewalk Replacement Bids Requested

The City of Salida will be accepting sealed bids for a project to replace sidewalk. The project is to include all labor and materials necessary to replace sections of sidewalk totaling 3,139 lineal feet. Specification packets may be picked up and bid proposals dropped off at the Salida Public Works Dept, located at 340 W ... more »

Addendum Issued for Bulk Water RFP

In response to questions from potential bidders for the bulk water fill station, the City's engineers have issued the attached addendum clarifying aspects of this request. more »

Notice of Final Settlement with Moltz Construction for the Water Treatment Plant Contract

Notice is hereby given by the City Council of the City of Salida, Colorado, that final settlement of a contract with Moltz Construction (Contractor) for the Water Treatment Plant Improvement Phase I, will be held at the regular meeting of the City Council of the City of Salida on the 1st day of July 2014, at ... more »

Page 6 of 65« First...45678...203040...Last »

The forecast for 81201 by WP Wunderground