Sealed bids accepted for 2016 11th Street Rehabilitation Project

Sealed BIDS for construction of the 2016 11TH Street Rehabilitation Project will be received at the City Public Works Building 340 W. Highway 291, Salida, CO 81201 until 9:30 AM, February 3, 2016. At which time they will be opened and publicly read.

The project consists of six and one half blocks of street rehabilitation and seven blocks of sewer line replacement in one block increments on seven alleys. The street rehabilitation includes removal of existing asphalt, which may be ground and utilized as two inches of the six-inch road base requirement.  Placement of concrete curbs, ADA ramps, curb ramps, pans, cross pans and driveways per plans.  Replacement of a small number of water service lines and meter pits per plans. Placement of road base and asphalt per plans.

A Bid Bond in the amount of 5% of bid price is required, and Performance and Payment Bonds in the amount of 100% of bid, will be required.  The project is tax exempt, the contractor will be provided with the tax exempt number for materials purchases.

A mandatory pre-bid meeting will be held on January 21, 2016 at 9:00am at the City Public Works Building 340 W. Highway 291, Salida, CO 81201. Contractors must have the capability to communicate via email and submit project documentation via cloud tools such as Dropbox.

The construction work of this project shall be started no later than April 1, 2016 completed no later than August 31, 2016.

Copies of the Contract Documents may be examined at City of Salida Public Works Building 340 W. Highway 291, Salida, CO 81201, or Crabtree Group, Inc. 325 D Street, Salida, CO (719.539-1675).

Copies of the Plans and Specifications will be available after January 12, 2016. Hard copies of the Contract Documents may be obtained from Crabtree Group, Inc. 325 D Street, Salida, CO (719-539-1675) upon a fee of $75.00 checks made out to the Crabtree Group, Inc. in advance and a FedEx shipping account number for requests for shipped drawings.  Electronic copies may be obtained free of charge from Crabtree Group, Inc. by email request to both jdeluca@crabtreegroup.net & tvandaveer@crabtreegroup.net. Subject line of email must be 2016 11th Street Rehabilitation Project.